Walls Near the Moodna and the Quassaick
We locate the water before we lay out any New Windsor retaining walls. The town carries both creeks, and a wall close to either one changes the job. Chapter two forty nine regulates stormwater here, and work near a watercourse can trigger it. So we measure the distance and read the grade. Then you hear what applies. Then the wall gets a drainage layer, a pipe and an outlet that stays clear of the creek. That is the part nobody sees on a finished New Windsor wall.
Drainage behind the stone is never optional on these lots. Water held behind a wall becomes pressure, and pressure moves stone. Clean drainage rock, perforated pipe and filter fabric go in before any New Windsor stonework rises. On a creek side property the outlet placement matters as much as the pipe. New Windsor retaining walls fail at the outlet far more often than at the face. So we place it first and build the stone around it.