The Floodway Question First
This is the very first question on a wall here. The village Building Inspector can determine the floodway status. That is part of the plan review, not an extra step. A wall inside a floodway is an entirely different project. It gets reviewed on different terms, and with different limits. We ask that question before anyone draws a wall at all. Fishkill retaining walls get that answer in writing first.
The same office also checks the rest of the paperwork. It verifies whether all the other required permits were obtained. So a missing filing shows up at review, not later. We prepare the full set rather than the minimum. Masonry in Fishkill, NY moves fastest when nothing is outstanding. A returned application is the most avoidable delay there is. We would much rather spend an hour than lose a week.