When a Project Trips the Survey
This is the rule that surprises people planning real work. A site plan or subdivision application requires a tree survey. Every tree over eight inches in diameter has to be listed. That is a drawing exercise before any design work starts. Section three oh five seventy five also controls trees in developments. Ordinary Walden plantings never come near that threshold. Walden landscaping on a residential bed needs nothing of the kind. A larger project is a different conversation entirely.
Knowing early is the whole advantage here. A survey added late costs a month of review time. Added at the start it is a morning of measuring. So we ask about the scope before drawing anything. If the project needs it, we prepare the survey work. Landscaping in Walden, NY includes that in the quote. You see one figure rather than a surprise later. Finding out at submission is the expensive way.





