Joints Over Settled Fill in New Windsor
We begin by checking whether the sand failed or the ground did. A probe tells us if the bedding course is still tight. Where fill has settled, the pavers flex under load and grind the joint material to dust. We vacuum those New Windsor paver joints to full depth and refill them. If the settling is severe, we tell you the surface needs lifting and resetting first. Sand will not rescue a base that has already given way.
Then the sand goes in properly. We sweep it to full depth, compact in passes, and sweep again to top off what dropped. The binder sets on a measured watering. Polymeric sand in New Windsor, NY only works when the joint is full from the bottom up. Half-filled joints look finished on day one and open again by the second winter. We top off a second time for that reason, then cure. New Windsor paver joints get checked once more before we pack up.





